Lahore trackless tram to launch next week, check proposed route and key details

A green and gold multi-car Lahore trackless tram parked on a paved street during road testing.
Lahore's new trackless tram prepares to launch next week, featuring an eco-friendly multi-carriage design.
Hafiza Almas Manahil | Published November 26, 2026 01:02 PM
Web Desk: Punjab is preparing to introduce a modern trackless electric tram service in Lahore next week, marking a major step towards futuristic public transportation and urban development.

The Lahore Trackless Tram project is expected to provide residents with another transport option while supporting the provincial government’s vision of a modern and environmentally friendly Punjab.

The announcement has attracted public attention as residents wait to see how the new transport system will operate on the city’s busy roads.

Unlike conventional trams, the new service will not require railway tracks and will use an advanced guided driving system.

The Punjab government has described the initiative as part of its wider efforts to improve urban mobility, introduce modern technology and provide better transportation facilities.

Lahore Electric Tram: What Is the New Transport System?

The Lahore Electric Tram is based on Autonomous Rail Rapid Transit (ART), also referred to in reports as Smart Rapid Transit (SRT).

It is a trackless electric public transport system that operates on rubber tyres instead of conventional railway tracks.

The vehicles use an advanced guidance technology to follow a designated route on ordinary roads.

This technology allows the system to provide a transport experience similar to a traditional tram without requiring the construction of a complete railway track network.

The electric-powered vehicles are also expected to offer an environmentally friendly alternative to conventional fuel-powered buses and other public transport.

The system could help improve passenger movement in busy parts of Lahore if it is introduced with proper traffic management and dedicated operating arrangements.

Lahore Tram Route: Thokar Niaz Baig to Harbanspura

According to available planning details, the proposed Lahore tram route is expected to connect Thokar Niaz Baig with Harbanspura.

The planned corridor is approximately 27 to 30 kilometres long and has been associated with Canal Road.

The proposed connection could provide transport access between important parts of the city and make daily commuting easier for residents travelling across different areas.

However, the final alignment and passenger stops have not yet been officially confirmed following changes in the earlier planning proposals.

Reports have also highlighted concerns regarding the use of Canal Road, particularly environmental issues involving possible tree cutting, along with technical and funding-related challenges.

These concerns have led to discussions about possible route revisions. Therefore, the proposed Thokar Niaz Baig to Harbanspura corridor should not yet be treated as the confirmed operational route.

Read Also: What will Pakistan’s first astronaut do in space? Zeeshan Ali’s historic mission explained

Which Areas Could Be Included in the Lahore Trackless Tram Project?

Several important locations have appeared in earlier planning discussions and media reports about the project.

These include:

  • Thokar Niaz Baig
  • Harbanspura
  • Gulberg
  • Central Business District (CBD)
  • Jail Road
  • Istanbul Chowk
  • Kalma Chowk
  • Liberty Market
  • Main Market
  • Mini Market
  • Hali Road

Ali Town, Muslim Town and Raiwind Road have also been mentioned in earlier discussions and reports concerning trial activities and possible transport corridors.

However, not all these locations are confirmed stations or passenger stops. The final list will depend on the route approved by the authorities.

Why Has the Canal Road Route Faced Changes?

Canal Road has been discussed as an important part of the proposed transport corridor. However, the plan has faced questions about its environmental and technical feasibility.

One major concern involves the possible cutting of trees to accommodate the transport infrastructure.

Environmental considerations have become an important part of discussions surrounding major development projects in Lahore.

Technical requirements, funding arrangements and road conditions have also been reported as factors affecting the route planning process.

The government will need to finalise these matters before the complete operational network can be announced.

How Will the New Electric Tram Benefit Lahore?

The Lahore Trackless Tram could provide several benefits if the project is successfully implemented.

First, it could offer another option for people who depend on public transportation for their daily journeys.

Second, its electric operation could help reduce dependence on conventional fuel-powered vehicles and support efforts to control transport-related air pollution.

Third, the trackless technology may reduce the need for expensive railway infrastructure compared with traditional tram systems.

It could also improve connectivity between commercial areas, residential neighbourhoods and important city locations.

However, its actual benefits will depend on passenger capacity, service frequency, route planning and integration with existing public transport services.

Ticket Prices, Timings and Launch Details

Although the Punjab government has announced the expected arrival of the tram next week, several important details are still awaited.

The authorities have not yet officially confirmed the final passenger route, station locations, ticket prices or daily operating timings.

It is also important to distinguish between the announced arrival or launch of the system and the beginning of regular passenger services.

Residents will need to wait for further government announcements to know when they can start using the service and which locations will be covered.

Currency / Metal / Petrol Rates
Currency → PKR
Currency Pair Rate (PKR) Change
🇺🇸 US Dollar USD → PKR 276.14 ▼ 0.16
🇪🇺 Euro EUR → PKR 303.31 ▲ 0.27
🇬🇧 British Pound GBP → PKR 362.40 ▼ 0.06
🇸🇦 Saudi Riyal SAR → PKR 73.58 ▼ 0.13
🇦🇪 UAE Dirham AED → PKR 75.19 ▼ 0.03
🇨🇳 Chinese Yuan CNY → PKR 41.43 ▼ 0.02
Current Metals
Metal Unit Price (PKR) Change
Gold 24K Per Tola 367,924 ▼ 8,400
Gold 22K Per Tola 337,264 ▼ 7,700
Gold 21K Per Tola 321,934 ▼ 7,350
Gold 18K Per Tola 275,943 ▼ 6,300
Silver Per Tola 4,241 ▼ 231
Platinum Per oz (USD) 1,275 ▼ 54.3%
Current Petrol
Fuel Type Unit Price (PKR) Change
Petrol Super Per Litre 318.00 ▼ 1.00
Diesel HSD Per Litre 220.28 —
High Octane Per Litre 415.00 —
Kerosene Per Litre 273.22 —
LPG Per Kg 478.51 —
Must Read