CBD Punjab's monsoon preparedness Keeps CBD route 47 fully operational during heavy rainfall

Wet asphalt roads of CBD Route 47 in Punjab during monsoon.
Monsoon preparedness keeps CBD Route 47 operational.
Published July 24, 2026 12:00 AM
LAHORE (Web Desk): The Punjab Central Business District Development Authority (PCBDDA), also known as Central Business District Punjab (CBD Punjab), successfully ensured uninterrupted traffic flow on CBD Route 47 during the recent monsoon spell, demonstrating the Authority's commitment to developing climate-resilient and future-ready urban infrastructure.

Despite heavy rainfall across Lahore, CBD Route 47 remained fully operational and free from water accumulation, providing commuters with a safe and smooth travelling experience.

The provincial capital of Punjab received 78 mm of rainfall, while the highest rainfall of 263 mm was recorded in the Airport vicinity, creating challenges for traffic movement across various parts of the city.

However, CBD Route 47 continued to perform efficiently due to its advanced stormwater drainage infrastructure and resilient engineering design.

Built in accordance with international standards, the project features a state-of-the-art drainage network that enables rapid rainwater disposal, preventing waterlogging and ensuring uninterrupted traffic even during intense monsoon showers.

CBD Punjab's Operations and Maintenance teams remained on high alert throughout the rainfall, continuously monitoring road conditions, drainage performance, and traffic flow.

Regular field inspections and timely operational responses ensured the route remained safe and accessible. The integrated drainage system continues to play a vital role in minimizing urban flooding and maintaining seamless connectivity along one of Lahore's key urban corridors.

Chief Executive Officer CBD Punjab, Imran Amin, said, "The uninterrupted operation of CBD Route 47 during heavy rainfall reflects CBD Punjab's commitment to resilient infrastructure, proactive planning, and sustainable urban development.

Read Also: Lahore drenched as torrential rain triggers urban flooding

We remain dedicated to delivering world-class infrastructure that serves the public efficiently under all weather conditions."

CBD Punjab also continued to extend technical and operational support to WASA and the Walton Cantonment Board during the monsoon season.

While the Kalma Chowk Underpass and Walton Road have been handed over to the respective agencies for operations and maintenance, CBD Punjab remains in close coordination with both organizations to facilitate efficient drainage management, smooth traffic flow, and commuter safety during heavy rainfall.

This collaborative approach reinforces CBD Punjab's commitment to building a resilient and sustainable urban transport network for Lahore.

Currency / Metal / Petrol Rates
Currency → PKR
Currency Pair Rate (PKR) Change
🇺🇸 US Dollar USD → PKR 277.85 ▲ 0.06
🇪🇺 Euro EUR → PKR 316.10 ▼ 0.89
🇬🇧 British Pound GBP → PKR 369.97 ▼ 1.47
🇸🇦 Saudi Riyal SAR → PKR 74.10 ▲ 0.27
🇦🇪 UAE Dirham AED → PKR 75.65 ▲ 0.02
🇨🇳 Chinese Yuan CNY → PKR 41.02 ▼ 0.03
Current Metals
Metal Unit Price (PKR) Change
Gold 24K Per Tola 426,216 ▲ 8,278
Gold 22K Per Tola 390,698 ▲ 7,588
Gold 21K Per Tola 372,939 ▲ 7,244
Gold 18K Per Tola 319,662 ▲ 6,209
Silver Per Tola 6,145 ▲ 270
Platinum Per oz (USD) 1,637 ▲ 40.6%
Current Petrol
Fuel Type Unit Price (PKR) Change
Petrol Super Per Litre 327.12 ▲ 6.39
Diesel HSD Per Litre 199.98
High Octane Per Litre 445.00
Kerosene Per Litre 233.71
LPG Per Kg 241.43
Must Read