Six of 11 Murree electric buses found with technical faults

Six of 11 electric buses in Murree have developed technical faults. File photo
Six of 11 electric buses in Murree have developed technical faults. File photo
Published September 1, 2026 12:00 AM
Murree (Web Desk): Six of 11 electric buses in Murree have developed technical faults, prompting officials to halt their operations until repairs and complete safety clearance are completed.

Officials have found technical faults in six of the 11 electric buses deployed in Murree under the Punjab government’s Green Bus Electric Bus Project.

Murree Deputy Commissioner Agha Zaheer Abbas Shirazi took notice of the issue and visited the buses along with a technical team.

The team inspected the affected buses and reviewed the problems reported by officials. The deputy commissioner also wrote to the Transport Secretary, seeking immediate repairs and complete technical clearance for the affected vehicles.

Buses kept off roads until clearance

The district administration has decided not to allow the affected buses to operate until technical experts declare them fit for service.

Officials have been directed to ensure that no bus is put on the road before the required safety checks are completed. The decision is aimed at protecting residents and tourists who use public transport in Murree.

Authorities said precautionary measures are being taken to prevent safety risks and minimise inconvenience to passengers. The buses will be allowed to resume operations only after technicians confirm that they are fully operational.

Chinese engineers to inspect buses

Chinese engineers are expected to visit Murree to identify and fix the technical faults.

They will also conduct a detailed inspection of the electric buses to determine whether any additional problems require attention. The technical team is expected to examine the affected vehicles and recommend the necessary repairs.

Officials hope the inspection will help identify the causes of the faults and ensure that the buses meet the required operational standards. The administration will rely on the technical clearance before allowing the vehicles to return to service.

Administration focuses on passenger safety

The technical problems have prompted the district administration to put passenger safety ahead of immediate bus operations.

Also Read: Rawal Dam water level rises sharply after heavy rains

Officials said they would take all necessary precautionary measures to protect citizens and tourists from unsafe or substandard transport services. Murree receives a large number of visitors throughout the year, making reliable public transport important for both tourists and residents.

Any disruption to the electric bus service could affect people who depend on public transport to travel around the hill station. However, authorities have made it clear that safety checks must be completed before normal operations resume.

Electric buses aim to improve Murree transport

The electric buses were introduced as part of a wider effort to provide modern and environmentally friendly transport in Murree.

The project aims to reduce pollution while offering safer and more comfortable travel for residents and tourists. Electric buses can also help reduce reliance on conventional fuel-powered vehicles in busy tourist areas.

Murree’s roads often experience heavy traffic during peak tourist periods, increasing the need for an organised and reliable transport system. The project is therefore expected to play an important role in improving local transportation once all technical issues are resolved.

Maryam Nawaz ordered 11 buses

Punjab Chief Minister Maryam Nawaz Sharif had directed authorities in June to hand over 11 electric buses to the Murree district administration.

The buses were introduced under the Punjab government’s Green Bus Electric Bus Project. The initiative is designed to improve public transport facilities while reducing environmental pollution.

The government has also focused on providing modern transportation options in areas with significant tourist activity. The deployment of the buses was expected to make travel easier for both residents and visitors.

Currency / Metal / Petrol Rates
Currency → PKR
Currency Pair Rate (PKR) Change
🇺🇸 US Dollar USD → PKR 277.29 ▼ 1.65
🇪🇺 Euro EUR → PKR 322.05 ▼ 1.14
🇬🇧 British Pound GBP → PKR 375.62 ▼ 2.29
🇸🇦 Saudi Riyal SAR → PKR 73.44 ▼ 0.44
🇦🇪 UAE Dirham AED → PKR 75.51 ▼ 0.45
🇨🇳 Chinese Yuan CNY → PKR 41.22 ▼ 0.25
Current Metals
Metal Unit Price (PKR) Change
Gold 24K Per Tola 463,590 ▲ 9
Gold 22K Per Tola 424,958 ▲ 8
Gold 21K Per Tola 405,642 ▲ 8
Gold 18K Per Tola 347,693 ▲ 7
Silver Per Tola 6,906 ▼ 0
Platinum Per oz (USD) 1,828 ▲ 10.7%
Current Petrol
Fuel Type Unit Price (PKR) Change
Petrol Super Per Litre 342.79 ▲ 0.77
Diesel HSD Per Litre 252.03
High Octane Per Litre 445.00
Kerosene Per Litre 286.44
LPG Per Kg 258.65 ▲ 4.33
Must Read