ADB adds $468 million loan burden on KP and Punjab public
The Asian Development Bank (ADB) said the funding would help protect rural communities from climate change, improve farming and strengthen food security. Around 728,000 people are expected to benefit from the two projects.
$208 million project to support farmers in KP
The ADB has approved a $208 million concessional loan for the Khyber Pakhtunkhwa Resilient Irrigated Agriculture Livelihoods Development Project. It aims to increase agricultural production and improve the incomes of small farmers in Nowshera, Swabi and Upper Chitral.
The project will improve existing irrigation systems and introduce modern farming technologies. These steps will help farmers use water more efficiently and protect their crops against climate-related problems.
The project will also provide livelihood training for women. It will encourage greater participation of women in decisions about water management and local agricultural activities.
“The project in KP will construct and rehabilitate irrigation systems to be more resilient to disasters,” the ADB said.
$260 million project to reduce flood risks in Punjab
The second project will receive a $260 million concessional loan under the Integrated Hill Torrent Management Project. It aims to reduce the risk of flash floods and improve the collection and storage of rainwater in the hilly areas of Punjab.
“The project in Punjab will bolster flood resilience by building critical water management infrastructure for water retention, drainage, and flood protection,” the bank said.
The project will develop facilities to store floodwater, improve drainage and protect communities from flooding. It will also promote spate irrigation, a farming method that uses seasonal floodwater to irrigate agricultural land.
The initiative will also use nature-based solutions to improve water supplies, recharge underground water reserves and restore natural ecosystems. These measures are expected to help communities make better use of available water resources.
Around 728,000 people expected to benefit
The ADB said the two projects would help protect communities from natural disasters and improve the provinces’ ability to respond to emergencies. They are also expected to increase crop production, create employment opportunities and provide more reliable water supplies.
“The projects will not only safeguard communities from the adverse impacts of natural hazards, advance provincial disaster preparedness, but also increase agricultural yields, create more jobs, and provide a reliable water source for agriculture, community consumption, and ecosystem restoration,” the statement concluded.
ADB Country Director for Pakistan Emma Fan said the projects would play an important role in improving food security and dealing with environmental challenges.
“Resilient water management infrastructure and sustainable farming practices are vital for the economic potential of rural communities in these two provinces,” she stated.
Federal government had already approved the projects
The federal government approved both projects last month, before the ADB announced its financing. The KP project has an estimated cost of Rs69.893 billion and includes the rehabilitation of the Pehur Main Canal, construction of the Mulkhow Irrigation Distribution System and extension of the Pehur High Level Canal.
The ADB will contribute Rs56.133 billion ($200 million), while the provincial government will provide Rs11.692 billion and arrange the required land acquisition. The project is designed to improve irrigation facilities and support farming communities in the province.
The second project, called Integrated Hill Torrent Management (Chachar–Mithawan), will cover Dera Ghazi Khan and Rajanpur districts. It has an estimated cost of Rs85.342 billion, with the ADB providing Rs73.060 billion ($260 million) and the Punjab government contributing Rs12.282 billion.
The ADB funding could help farmers in KP and Punjab deal with two major problems: water shortages and floods. Better irrigation, water storage and modern farming methods can improve crop production and support rural incomes.
However, the success of these projects will depend on proper planning, timely construction and effective use of funds. Regular monitoring will also be important to ensure that farmers and local communities receive the promised benefits.
Also read: Pakistan gets another $250 million ADB loan to attract investment